Produ(A)ctive Papaverdriehoek
[embeddoc url=”http://www.europan.nl/wp-content/uploads/2017/11/Papaverdriehoek-NP407.pdf” width=100% height=600px viewer=”google” ]
Jury comments
This proposal shows an interesting approach on sustainability and urban green, developed with a focus on productive green. The proposed landscape structure is connected with its surroundings on a larger scale and operates as a biodiversity corridor in relation with the urban water system. The jury values this approach but thinks that the phasing is not realistic. The jury is not convinced by density of the proposal for the site. Despite the fact that the plan is focused on productive green strategies the ground floor hardly shows any synergy with the wider structure of public spaces. Also, there are some doubts if the proposed architectural appearance is fitting in the area.
Project Team
Contact information
Via Birago 2, 20133, Milano, IT